Wednesday, June 23, 2021
Putting in the Windows
My friend Nancy had said she and other nurses had signed some of the beams when the new clinic was built. I got Phil and Brent to sign their names on the header board over the opening for the garage door in Sleipnir. Got a call from Ziegler the electrician. Was I available for a walk-thru for the electrical in the new building? We'd made a plan before the building started but he wanted to mark on the studs where everything would be placed. I did add another light just inside the door. Now that the mechanical room has been roughed in, I could see where it would block the light reaching the door when I walked in. Changed the outside lights from a pair inside the soffits to one motion-detector light at the peak. Added three outside outlets too. Not sure what I'd do w/ them but plugging in Christmas lights came to mind for one option. Ziegler the electrician said he had called Digger's Hotline again since he would be burying the electrical from the backboard into the new building and wanted to double check where the lines were in that tight area.. Phil and Brent drove to Churchtown on a spending spree and I took the dog for a walk. Got back and saw Diggers had already come and gone. Mike the Builder and Josh arrived later to fit the windows.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment