The plumber stopped by today and installed the hot water heater in the maintenance room, the washtub in the garage, and the sink in the bathroom. However, he needed to order a different faucet for the workroom and he still needs to install the toilet. He said he'd be back on Tuesday to get those things done. In the meantime, Phil and Brent have been busy working on the trim. They need to cut the pieces to size, varnish, and then install. You can see two of the windows are completely done. They took a break tonight and we drove to a supper club north of here so I could treat them to a dinner of their choice. Seemed like the least I could do for all the work they have been doing in the garage besides making them eat my cooking!
Thursday, July 25, 2019
Trim's going up
The plumber stopped by today and installed the hot water heater in the maintenance room, the washtub in the garage, and the sink in the bathroom. However, he needed to order a different faucet for the workroom and he still needs to install the toilet. He said he'd be back on Tuesday to get those things done. In the meantime, Phil and Brent have been busy working on the trim. They need to cut the pieces to size, varnish, and then install. You can see two of the windows are completely done. They took a break tonight and we drove to a supper club north of here so I could treat them to a dinner of their choice. Seemed like the least I could do for all the work they have been doing in the garage besides making them eat my cooking!
Subscribe to:
Post Comments (Atom)
1 comment:
Nancy says "nice"!
Post a Comment